Room | Dimensions | Level | Flooring |
---|---|---|---|
Hallway | 5.7 x 4.11 P | Ground Floor | Ceramic tiles |
Living room | 13.3 x 15 P | Ground Floor | Wood |
Dining room | 10 x 9.5 P | Ground Floor | Wood |
Kitchen | 10 x 11.10 P | Ground Floor | Linoleum |
Primary bedroom | 15.1 x 11.10 P | Ground Floor | Wood |
Bathroom | 8.11 x 7.11 P | Ground Floor | Ceramic tiles |
Bedroom | 17.4 x 9.6 P | Ground Floor | Wood |
Bedroom | 17.7 x 8.11 P | Ground Floor | Wood |
Bedroom | 17.4 x 8.11 P | Ground Floor | Wood |
Bathroom | 7.9 x 7.9 P | Ground Floor | Ceramic tiles |
Storage | 9.2 x 6.9 P | Basement | Linoleum |
Storage | 9.7 x 12.7 P | Basement | Floating floor |
Driveway | Plain paving stone, Plain paving stone, Plain paving stone, Plain paving stone, Plain paving stone |
---|---|
Landscaping | Landscape, Landscape, Landscape, Landscape, Landscape |
Cupboard | Wood, Wood, Wood, Wood, Wood |
Heating system | Space heating baseboards, Space heating baseboards, Space heating baseboards, Space heating baseboards, Space heating baseboards |
Water supply | Municipality, Municipality, Municipality, Municipality, Municipality |
Heating energy | Electricity, Electricity, Electricity, Electricity, Electricity |
Windows | PVC, PVC, PVC, PVC, PVC |
Foundation | Poured concrete, Poured concrete, Poured concrete, Poured concrete, Poured concrete |
Siding | Aluminum, Wood, Aluminum, Wood, Aluminum, Wood, Aluminum, Wood, Aluminum, Wood |
Proximity | Cegep, Elementary school, High school, University, Daycare centre, Cegep, Elementary school, High school, University, Daycare centre, Cegep, Elementary school, High school, University, Daycare centre, Cegep, Elementary school, High school, University, Daycare centre, Cegep, Elementary school, High school, University, Daycare centre |
Bathroom / Washroom | Seperate shower, Seperate shower, Seperate shower, Seperate shower, Seperate shower |
Basement | 6 feet and over, Finished basement, 6 feet and over, Finished basement, 6 feet and over, Finished basement, 6 feet and over, Finished basement, 6 feet and over, Finished basement |
Parking | Outdoor, Outdoor, Outdoor, Outdoor, Outdoor |
Sewage system | Municipal sewer, Municipal sewer, Municipal sewer, Municipal sewer, Municipal sewer |
Window type | Sliding, Crank handle, Sliding, Crank handle, Sliding, Crank handle, Sliding, Crank handle, Sliding, Crank handle |
Roofing | Asphalt shingles, Asphalt shingles, Asphalt shingles, Asphalt shingles, Asphalt shingles |
Topography | Flat, Flat, Flat, Flat, Flat |
Zoning | Residential, Residential, Residential, Residential, Residential |